Power supply

A COMPLEX APPROACH

We develop power supply systems and design transformer substations from initial concept to final commissioning. Our solutions guarantee reliable power supply to end consumers as well as safe maintenance of the power supply system and its components

Our solutions

Object
Name of workWork
Year
«Vetropak Gostomelskyi Sklozavod» PrAT, Ukraine
Modernization of RP-11 equipment and facilities and 10 kV internal networks including replacement of 10 kV cells, 10 kV reactive power compensation devices and 10 kV cable lines. Design, manufacture and supply of equipment, installation, commissioning works
«SHU «POKROVSKE» PRAT, Ukraine
KTP, RU-0.4 kV at 5000 A, 6300 A, connecting busbars, 6 kV high voltage cells. A set of works to transfer the voltage from the diesel generator to the buses of the substation 6.3 kV PS-110 with an increase in voltage from 0.4 to 6.3 kV. Design, Supply of equipment, electrical installation, installation and commissioning works
«Bandur oil extract - tsyiny zavod» LLC, Ukraine
Modernization of PS 35/10 kV and GRP-10 kV equipment for the possibility of operation of the CHP plant in the island mode of the oil extraction plant with a capacity of 1500 t/day
«Starokonstantinovsky OEZ» LLC, Ukraine
Connecting a 29 MW steam turbine generator to a 10.5 kV TPP main switchgear. ACS TP of the fuel supply unit and areas of auxiliary equipment of the thermal power plant of the oil extraction plant with a capacity of 3000 t/day. Design, supply of equipment, electrical installation, installation and commissioning works
«VOVCHANSKY OEZ» PrAT, Ukraine
GRP-10.5 kV; Power transformers 10.5/0.4 kV; Distribution device 0.4 kV of CHP own needs; Equipment of high-voltage cells RP TP-1. Disconnection and dismantling of equipment. Preparation for relocation
«Prydniprovsky Oil Extraction Plant» LLC, Ukraine
Construction of a steam power station with a cogeneration plant with an electrical capacity of up to 26 MW and backup power supply of the plant in full «blackout» mode. PS 35/10 kV and GRP-10 kV of the thermal power plant of the oil extraction plant with a capacity of 2700 t/day. Design, supply of equipment, electrical installation, installation and commissioning works
Seed factory «KVS-UKRAIN», m. Kamianets-Podilskyi, Ukraine
Complex for conditioning seeds of agricultural crops. Department of reception, drying of preliminary cleaning, sorting. Supply, installation and electrical installation works, installation of equipment, commissioning works
«Kharkiv heat networks» KP, Ukraine
Central heating points, pumping stations, boiler houses. ASU TP. Construction of the SCADA system. Design, application software, manufacture and supply of electrical equipment.
«Slavutsky malt plant» PJSC, Khmelnytskyi region, Ukraine
Boiler room. ASU TP. Modernization of the control cabinet. Application software, supply of equipment, installation, commissioning works
Nestle «Technocom» LLC (TM «Miwina»), Kharkiv, Ukraine
Existing KTP-3 substation. Power dry transformer 1600 kVA 6/0.4 kV Schneider Electric. Supply of equipment, electrical installation, installation and commissioning works, acceptance and acceptance tests of the power transformer and tire bridge, testing of the power cable line to the transformer, checking the operation of the relay protections of the transformer, drawing up a report and handing it over to the Customer
* Обязательное поле