We develop power supply systems and design transformer substations from initial concept to final commissioning. Our solutions guarantee reliable power supply to end consumers as well as safe maintenance of the power supply system and its components

Our solutions

Object
Name of workWork
Year
Amcor Specialty Cartons Ukraine
10kV Transformer Substation of the Factory. Replacement of two relay protection devices. Projecting, manufacturing and supply of equipment, electrical installation, commissioning works, and startup
Poltava Mining (Ferrexpo), Gorishni Plavni, Ukraine
Kiln No. 1, CPO 1. Automated Process Control System (APCS) and Electric Drive Control System (EDCS). Implementation of a load distribution system on the main drive of the roasting kiln. Projecting, commissioning works
Mykolaiv Alumina Plant LLC, Mykolaiv, Ukraine
Sludge Storage No. 2. Automated Process Control System (APCS) and Electric Drive Control System (EDCS). Experimental red sludge transportation system. Projecting, manufacturing and supply of electrical equipment, supervision of installation works
ArcelorMittal Temirtau JSC, Temirtau, Kazakhstan
Coke Battery. Pusher Machine. Electric Drive Control System (EDCS) for 400A DC drives to power the pusher machine's power circuits via a single-wire trolley power supply
Qazaq-Astyq Group, Semey, Kazakhstan
Oil Extraction Plant. Dehulling and winnowing section, oil pressing workshop, meal and husk granulation areas, oil tank farm section. Automated Process Control System (APCS). Projecting, manufacturing, and supply of electrical equipment
Poltava Mining (Ferrexpo), Ukraine, Gorishni Plavni
Kiln No. 3 CPO. Thyristor drive for the kiln. Electric Drive Control System (EDCS) and Power Supply. Manufacturing and supply of equipment, commissioning works
Mykolaiv Alumina Plant LLC, Mykolaiv, Ukraine
Pumped station for clarified water return. ASDU – Automated Remote Control System. Manufacturing and supply of electrical equipment.
Poltava Mining (Ferrexpo), Ukraine, Gorishni Plavni
Crushing plant. ACS TP and electrics 6/0,4 kW. Projecting, feasibility study phase
INTERPIPE NTRP PJSCDnipro, Ukraine
Tube-rolling plant No3, 4. Energy audit of ventilators and pumps’ electric motors. Examining followed by issuing a protocol and feasibility study
INTERPIPE NMPP OJSC, Novomoskovsk, Ukraine INTERPIPE NMPP OJSC, Novomoskovsk, Ukraine
Electric-weld pipe mill159/530 mm PTSS. Leveling machine. ACS TP. Electric drives overhaul. Projecting, equipment manufacturing and supply, electric assembling, assembling and commissioning